McCURDY COATINGS

Warehouse & Distribution Roofing

Silicone cool roof systems engineered for the extreme heat loads and large footprints of Central Valley warehouses and logistics facilities.

50–70%

Less than replacement

Restoration can preserve a sound roof deck without tear-off costs.

15–25%

Cooling savings

Typical cooling-related energy reduction cited for reflective systems.

Up to 30

Years of NDL coverage

Manufacturer-backed warranty terms depend on the specified system.

10,094+

Completed services

McCurdy's current company-wide service milestone.

System Options

A Roofing System Matched to Your Building

The right specification depends on the existing roof assembly, moisture findings, drainage, and operating requirements. McCurdy assesses those conditions before recommending a system.

Silicone restoration

Best for: sound membrane roofs

A ponding-water-resistant, seamless membrane that renews aging low-slope roofs around drains, curbs, and penetrations.

Metal roof restoration

Best for: warehouses with exposed panels

Rust treatment, fastener work, seam reinforcement, and a reflective topcoat help manage movement and heat.

SPF and protective coating

Best for: insulation upgrades

A project-specific option when the roof needs added insulation, slope correction, or a seamless waterproofing layer.

Case Study

Keeping a distribution roof in service

Representative Central Valley project profile

Large, active warehouse with broad low-slope roof areas, rooftop equipment, and loading operations that could not pause for a tear-off.

Plan a Similar Project

The challenge

Heat, ponding, and aging details were putting inventory and daily operations at risk while a full replacement would have created major disruption.

The approach

The assessment mapped moisture, repaired compromised areas, reinforced penetrations and traffic paths, and matched a high-SRI silicone system to the existing assembly.

The outcome

A documented restoration plan preserved the usable roof, reduced disruption around dock schedules, and created a maintainable path to manufacturer-backed warranty coverage.

More Building-Specific Resources

Explore Roofing for Other Facilities

Built for High-Volume, High-Heat Operations

Why Silicone Is the Right Coating for Warehouse Roofs

Warehouses present one of the most demanding roofing environments in commercial construction: vast flat decks, heavy rooftop equipment, constant foot traffic around HVAC units, and summer heat loads that drive interior temperatures up and cooling bills higher.

Silicone coatings were engineered for exactly these conditions. Unlike acrylics, silicone doesn't re-emulsify under ponding water — it stays bonded and watertight even when water sits on the roof for days. Unlike asphalt-based systems, silicone reflects rather than absorbs solar energy, reducing rooftop temperatures by 40–60°F and cutting HVAC runtime proportionally.

For a 200,000 sq ft distribution center, that temperature difference translates directly to energy savings every day the sun is up — and in Tracy, Lathrop, Stockton, and Modesto, that's a lot of days.

Reduces rooftop temperatures by 40–60°F compared to dark membranes
Reflective systems specified against current California Title 24 requirements
NDL warranties up to 30 years from Carlisle, ASC, or Tropical Coatings
Applied over existing membrane — no tear-off, no landfill
Compare actual costs and review tax treatment with your advisor
Minimal operational disruption — crews work around dock schedules
Seamless waterproofing across all penetrations and drains
SRI 95–110+ — highest reflectance class available

What We Solve

Key Challenges in Warehouse Roofing

Extreme Summer Heat Loads

Central Valley warehouses routinely see rooftop temperatures above 170°F in July and August. Every degree of surface heat that penetrates the roof deck is BTUs your HVAC — and your workers — must cope with.

Ponding Water on Low-Slope Decks

Warehouse roofs are commonly flat or nearly flat, making them prone to standing water after rain. A silicone coating's zero water-absorption characteristic is designed specifically for this condition.

Rooftop Equipment & Foot Traffic

HVAC condensers, exhaust fans, and solar arrays require periodic maintenance access. McCurdy's reinforced detail work protects penetrations and traffic paths so routine access doesn't compromise the membrane.

Large Square Footages

A 200,000 sq ft distribution center represents an enormous capital exposure on the roof. Silicone restoration at 50–70% of replacement cost is the financially responsible answer when the deck is otherwise sound.

Central Valley & Bay Area Service

Warehouse Roofing in Your City

We serve major warehouse and logistics corridors from the Bay Area through the Central Valley.

Common Questions

Warehouse Roofing FAQ

Can silicone be applied to a warehouse roof that's still in operation?

Yes. McCurdy crews coordinate application around dock operations and peak receiving windows. Silicone coatings cure without strong solvent odors, and the application process creates no structural disruption to the building interior.

How long does it take to coat a 100,000 sq ft warehouse roof?

Most warehouse roofs in that size range are completed in 3–5 days of applied work, depending on surface preparation needs, penetration count, and weather. We provide a detailed schedule at the estimate stage.

What happens if my existing roof has moisture trapped in the insulation?

McCurdy's assessment includes an infrared thermal scan to locate saturated insulation. Those sections are removed and replaced before coating — applying a new membrane over wet insulation is the single most common cause of premature coating failure, and we won't do it.

Does my warehouse roof qualify for restoration, or does it need replacement?

Roughly 80% of the commercial flat roofs we assess are restoration-eligible. The key factors are substrate adhesion, moisture content, and the condition of flashings and penetrations. Our free assessment gives you a definitive answer.

Will the cool roof coating reduce my energy bills enough to justify the cost?

In the Central Valley, where cooling degree-days are high and warehouses often have minimal insulation, the energy offset is substantial. Most clients see 15–25% reductions in cooling-related energy consumption. We can provide estimated payback periods at the quote stage.

Free Roof Assessment for Your Warehouse

McCurdy's assessment includes an infrared moisture scan and a written restoration vs. replacement recommendation — no obligation.