McCurdy's Primary System
Why Silicone? 40 Years of Proof Across the Bay Area.
Silicone roof renewal is the financially, technically, and environmentally superior solution for most Bay Area commercial buildings. Here's every reason why — backed by four decades of field experience across San Mateo, Alameda, Contra Costa, San Joaquin, Stanislaus, and San Francisco counties.
Review
your actual scope
Tax Planning
Check
current product ratings
Roof Reflectivity
15–20
years
Roof Life Extension
15–25%
avg savings
Cooling Cost Reduction
Assess
details and drainage
Moisture Protection
Less
tear-off when eligible
vs. Full Replacement
Financial Advantage
Silicone Renewal Protects Your Roof Budget
From upfront cost savings to federal tax deductions, silicone renewal delivers documented financial benefits that go well beyond protecting the roof itself.
Current Tax Guidance
Check the rules—not a promised deduction
IRS instructions state that Section 179D ended for property whose construction begins after June 30, 2026. Do not budget this deduction for a newly started roof project. An earlier qualifying project requires separate review of its timing, performance certification, and other requirements.
Source: IRS Form 7205 instructions. Ask your tax professional to review the actual scope and current rules.
Lower Upfront Cost Than Full Replacement
In restoration-eligible situations, silicone renewal costs substantially less than a full tear-off and replacement. You retain the structural value of your existing roof system and spend your capital on renewal — not demolition.
Delays Major Capital Replacement
Extending your existing roof by 15–20 years through silicone renewal improves your life-cycle value and defers a major capital expenditure — freeing budget for business-critical priorities.
Scope-Specific Tax Planning
Qualifying repairs may be currently deductible, while improvements may require capitalization or qualify for a Section 179 election under applicable rules and limits. Replacement is not automatically limited to 39-year depreciation, and a coating is not automatically a repair. Have your tax professional evaluate the itemized scope.
Check Current Incentives Before Budgeting
Do not assume an energy deduction is available for a new project. IRS instructions state that Section 179D ended for property whose construction begins after June 30, 2026. Earlier projects require separate review of timing, certification and other eligibility rules. Ask your advisor to assess current options without treating a reflective coating as automatic qualification.
Technical Performance
Built to Perform Where Others Fail
Silicone's chemical properties give it performance advantages in the specific conditions Bay Area commercial roofs face — UV exposure, seismic movement, coastal moisture, and ponding water.
Seamless Monolithic Waterproofing
Silicone is applied as a fluid coating that cures into a single, continuous membrane — no seams, no laps, no joints. Every penetration, drain, and transition is coated as part of the system, eliminating the weak points where water enters.
Outstanding Ponding Water Resistance
Silicone is uniquely suited to ponding water conditions — it does not absorb water, re-emulsify, or degrade under sustained wet conditions. Many systems are specifically engineered and warranted for ponding water protection.
Superior UV & Weathering Resistance
Silicone chemistry is inherently resistant to UV breakdown, ozone, and normal weathering cycles. Unlike acrylic systems, silicone does not dry-out, crack, or chalk over time — it maintains performance across the full warranty period.
Flexibility Without Cracking
Commercial roofs move — from thermal expansion and contraction, structural deflection, and seismic loading. Silicone remains flexible across a wide temperature range, resisting cracking and delamination in conditions that stress more brittle alternatives.
Rain-Ready Moisture-Cure Performance
Silicone's moisture-cure chemistry means it can tolerate higher humidity conditions during application than water-based coatings. This shortens weather-risk windows during installation and reduces scheduling delays on Bay Area projects.
Compatible With Major Substrates
Silicone systems bond to a wide range of commercial roof substrates — modified bitumen, BUR, single-ply, metal, concrete decks, and more — when the existing roof is restoration-eligible. McCurdy's assessment confirms compatibility before work begins.
Energy & Comfort
Your Roof Is Your Largest Energy Asset
A silicone cool roof doesn't just protect your building — it actively reduces the energy your building consumes. Every degree of reduced roof temperature reduces the load on your HVAC system.
High Solar Reflectance — Immediate Effect
Silicone cool roof systems achieve Solar Reflectance Index (SRI) values of 95–110+, reflecting the majority of incoming solar energy before it can be absorbed into the building. The effect is measurable from day one.
Lower Roof Surface Temperatures
On a hot summer day, a dark conventional roof can reach 150–180°F. A silicone-coated cool roof under the same conditions may stay 50–80°F cooler — directly reducing the heat transferred into your building.
Reduced Cooling Demand & HVAC Load
Lower roof temperatures reduce building heat gain, which reduces the load on rooftop HVAC units. Bay Area commercial projects typically see 15–25% reductions in cooling energy costs after cool roof installation. For a building spending $3,000/month on summer electricity with 30% cooling-related, that's $1,350–$2,250 in annual savings.
Less Strain on HVAC Equipment
Reduced cooling demand translates to fewer operating hours and lower peak loads on compressors and air handlers — extending equipment life and reducing maintenance costs beyond the energy savings alone.
Better Comfort in Non-Conditioned Spaces
Warehouses, distribution centers, and lightly conditioned industrial spaces benefit dramatically from reduced radiant heat gain through the roof. Interior temperatures drop measurably, improving working conditions without additional HVAC investment.
Peak-Demand Reduction
Cooling demand is highest during peak rate periods. By reducing the cooling load during the hottest part of summer days, silicone cool roofs can reduce demand charges — the per-kilowatt peak demand fees that often represent a large share of commercial electric bills.
Real Numbers
What 20% Savings Looks Like
$3,000
Monthly electric bill (summer)
Typical commercial facility
$900
Cooling-related share
30% of total bill
$2,160
Annual savings at 20% reduction
Every year, indefinitely
Zero-Disruption Installation
No Tear-Off. Minimal Downtime. No Drama.
McCurdy's silicone renewal process is engineered for occupied commercial buildings. Your tenants keep working. Your loading docks stay clear. Your customers don't know we're there.
No Full Tear-Off — Restoration in Place
In qualifying restoration scenarios, the existing roof system stays in place. No demolition, no structural exposure, no re-roofing from scratch. The silicone system is applied directly over the prepared existing surface.
Minimal Business & Tenant Disruption
Compared to a full tear-off replacement, silicone restoration creates far less noise, dust, odor, and operational interruption. Occupied buildings — including retail, office, and industrial — can typically continue normal operations throughout the project.
Cleaner Project Conditions
No dumpsters, no debris piles, no heavy equipment at loading docks. Storefronts, employee parking, customer access, and neighboring properties are protected from demolition-related impacts that come with full replacement.
Drastically Reduced Landfill Waste
A full commercial roof tear-off generates tons of membrane, insulation, and substrate material bound for landfill. Silicone restoration eliminates that waste entirely — a significant environmental and community benefit.
Silicone Renewal vs. Full Replacement
Restoration-eligible buildings
Sustainability & Compliance
California Ready. ESG Ready. Future Ready.
Silicone cool roofs align with California's strictest energy and environmental standards — and support the sustainability commitments increasingly required by tenants, lenders, and investors.
California Title 24 Compliance Pathway
CRRC-rated silicone systems provide a clear compliance pathway for California's cool-roof requirements under Title 24 — for both low-slope reroof projects and applicable alteration scenarios.
Lower Urban Heat Island Effect
High-reflectance roofs in dense commercial areas collectively reduce ambient outdoor temperatures in the surrounding neighborhood. McCurdy-installed cool roofs contribute to a measurable reduction in the Bay Area's urban heat island.
Greenhouse Gas Reduction Support
Lower cooling energy consumption directly reduces the carbon footprint of your building — supporting corporate ESG commitments, tenant sustainability requirements, and California's climate goals.
Low-VOC & Solvent-Free Options
Silicone systems are available in low-VOC and solvent-free formulations suitable for sensitive occupied buildings, medical facilities, food production environments, and operations with strict air quality requirements.
NSF-Listed Products Available
Certain silicone coating products carry NSF listing — relevant for facilities with rainwater catchment systems, sensitive agricultural uses, and other applications where roof coating chemistry matters.
Mold & Mildew Resistant Formulations
Silicone's moisture-shedding properties, combined with available mold-resistant additives, resist organic growth on the roof surface — a particularly valuable feature in Northern California's mild, moist climate.
Serving These Bay Area Counties
McCurdy Coatings delivers silicone renewal services across all major Northern California commercial markets:
Ready to see if your roof qualifies for silicone renewal?
McCurdy's free assessment includes an infrared moisture scan, full photographic documentation, and a written system recommendation. No obligation.
Technical reference
Need the chemistry and sequencing details?
Read the canonical engineering FAQ for system-specific preparation, field verification, coating chemistry, and restoration layer sequence guidance.