Warranty requirements are system- and manufacturer-specific, so the current warranty manual, project specification, and inspector’s approval control. The preparation record should identify the cleaning method, repairs, substrate limitations, moisture investigation, and any primers or reinforcement required for the selected system.
Where the manufacturer or project specification calls for field adhesion testing, the test method, locations, results, substrate failure mode, repairs, coating thickness, and documentation should be recorded and accepted under the applicable warranty program. A field-test value from one system should not be presented as a universal pass/fail rule for every coating or substrate.